G7 · Acceptance

Does the solution do what the business needs?

Source
Stage-Gate®; PRINCE2® stage boundaries; ISO 21502 governance
Level
B · established practice

Evidence

UAT scriptscriticaldepends on context
Acceptance criteriacriticaldepends on context
Test reportcriticaldepends on context
UAT sign-off recordcriticalany context
Defect logcriticaldepends on context
Defect logrequireddepends on context
Process pilot reportcriticaldepends on context
Site inspection record and snag listcriticaldepends on context
Operational readiness report (OAT)criticaldepends on context
Training materialsrequiredwaivabledepends on context
Change logrequireddepends on context
Trial load reportcriticaldepends on context

Checks

  • No open critical defects
  • Acceptance criteria verified by business users
  • Verified end to end by the owners of consuming systems

How the gate runs

Predictive
Phase gate: held once, at the end of the stage.
Agile (iterative)
Rolling gate: held per release; item readiness via Definition of Ready, completion via Definition of Done.
Flow (Kanban)
Policy gate: explicit exit policies on the board columns, applied to every item.
Hybrid
Phase gate per phase, with iterations or flow inside the phase.