Flow metrics

Track WIP, throughput, work item age and cycle time.

Use when
Flow or iterative work with a tracker.
Avoid when
Metrics turned into individual targets.
Source
The Kanban Guide (2020)
Level
A · standard
For agents · MCP
explain_node({ "id": "p.flow_metrics" })