Backlog refinement

Break down, clarify and order upcoming items until they are ready to start. In the Scrum Guide 2020 refinement is an ongoing activity, not an event, and takes as long as the team needs.

Cadence
ongoing, as much as the team needs (the 10% guideline of older Scrum Guides was removed in 2020)
Source
Schwaber & Sutherland, The Scrum Guide (2020)
Level
A · standard